top of page

Permits

This page provides a list of permits you might need for your project. Each permit entry includes a brief description, the issuing agency, contact details, and links to application forms. Whether you're starting a new development or ensuring compliance with regulations, this resource will help guide you through the permitting process.

USACE 401 Permit

A 401 Water Quality Certification ensures that any project discharging into U.S. waters meets state water quality standards, providing essential environmental protection and regulatory compliance.

vecteezy_blue-water-web-banner-with-copy-space-generative-ai_30200802.jpg

USACE 404 Permit

A 404 Permit authorizes the discharge of dredged or fill material into U.S. waters, including wetlands, ensuring that projects comply with environmental regulations to protect aquatic ecosystems.

vecteezy_the-river-water-is-murky-and-dirty_20041579.jpeg

USACE 408 Permit

A USACE 408 Permit is required for modifications to existing U.S. Army Corps of Engineers projects, such as levees or dams. It ensures that changes don’t compromise the integrity or purpose of the original structure. For more details, visit our resource page.

vecteezy_hoover-dam-at-lake-mead_24609264.jpg
bottom of page